Roadworks Aquafin Heihuizen N153
Aquafin is replacing pressure pipes between Wechelderzande, Vlimmeren, and Oostmalle. Due to the works, no motorized traffic is possible on Heihuizen from June 1, 2023, until the end of the works, which is expected between November 2023 and April 2024. All traffic is being diverted via Vlimmeren and Zoersel.
For those who still need to be at Heihuizen, the best solution is to use the WAZE application.
Coming via the highway from the direction of Antwerp, Turnhout, Eindhoven:
Take exit 20 Zoersel and follow the road towards Zoersel. After 3 km, you drive through the village. Turn right onto Salphensebaan. At the end of Spuydreef, you arrive at Heihuizen. Turn right or left on the road but be mindful of cyclists who have the right of way. No through traffic is possible. Cyclists and pedestrians can always pass through.
For the youth camps, the Fly-in in August, and the garden days Heihuyzen in September, a clear traffic plan will be communicated. The events will go on! The B&B Heihuyzen also remains accessible via the same route.

